TenantAtlas/docs/ui-ux-enterprise-audit/page-reports/ui-014-restore-runs.md
ahmido c0c3286a80 feat: add restore readiness resolution adapter improvements (#461)
Automated PR created by Codex via Gitea API.

Co-authored-by: Ahmed Darrazi <ahmed.darrazi@live.de>
Reviewed-on: #461
2026-06-20 12:51:12 +00:00

2.2 KiB

UI-014 Restore Runs

Field Value
Route /admin/workspaces/{workspace}/environments/{environment}/restore-runs
Source RestoreRunResource
Area / scope Backup / restore / environment
Archetype Backup / Restore
Design depth Strategic Surface
Repo truth repo-verified route; browser blocked
Screenshot ../screenshots/desktop/ui-014-restore-runs.png
Browser status Local Spec 180 fixture returned Forbidden; Spec 390 adds create/view readiness guidance and requires a focused smoke fixture.

First Five Seconds

The browser pass could not evaluate the product page because restore capability/state was unavailable. The route is still strategic because restore is the highest-risk operator workflow in the product.

Productization Review

  • Decision-first: not evaluated in browser.
  • Evidence-first: restore preview, request, result, and recovery proof must be central.
  • Context: environment-bound route.
  • Customer/auditor safety: high after execution.
  • Diagnostics: raw provider responses must stay secondary.

Information Inventory

Expected default content should distinguish restore intent, simulation/preview, validation, requested items, execution state, result truth, and recovery evidence.

Dangerous Actions

Restore execution is destructive/high-impact. Target state must include dry-run/preview, explicit confirmation, audit, OperationRun continuity, and post-run evidence.

Scores

IA Density User Clarity Sellability Disclosure Hierarchy DS Fit A11y Responsive Components UX Writing Perf
0 0 0 0 0 0 0 0 0 0 0 0

Top Issues

  1. Browser review blocked by local capability/data.
  2. Restore workflow needs continued browser proof for broader failure/conflict/confirmation states after Spec 390 readiness guidance.
  3. Preview/result/evidence truth must be separated visually.

Target Direction

P0 restore safety implementation-wave smoke with an authorized fixture. Spec 390 covers Restore-local readiness and next-safe-action guidance on create/view; list and broader terminal/failure states still need follow-up coverage.