TenantAtlas/docs/ui-ux-enterprise-audit/target-experience-briefs/workspace-overview.md
ahmido 3eff4d8579 Spec 325: add screenshot-anchored strategic target images (#385)
## Summary
- add the Spec 325 artifacts for screenshot-anchored strategic target images
- update the UI/UX enterprise audit documents to capture strategic surfaces and grouped follow-up candidates
- add supporting follow-up specs, target experience briefs, and target image assets for the audit workflow

## Testing
- not run (documentation/spec artifact changes only)

Co-authored-by: Ahmed Darrazi <ahmed.darrazi@live.de>
Reviewed-on: #385
2026-05-18 07:18:13 +00:00

6.0 KiB

Workspace Overview Target Experience Brief

Metadata

Field Value
Surface IDs UI-001, UI-002
Route /admin -> /admin/workspaces/{workspace}/overview
Source screenshot ../screenshots/desktop/ui-001-workspace-overview.png
Source page report ../page-reports/ui-001-workspace-overview.md
Target sidecar ../target-images/target/workspace-overview-target.md
Primary persona Workspace owner / MSP operator
Secondary personas Manager, support reviewer
Repo-truth posture Source route and screenshot are repo-verified; target composition is direction only.

Current-State Snapshot

The page already reads as a calm workspace home with operational and governance attention cards. The current page report says several valuable paths compete at the same level: choose environment, operations, alerts, backup attention, recovery attention, findings, and hygiene.

Current-State Productization Problems

  • Primary next action is not singular enough for a first landing page.
  • Backup, recovery, alerts, and assigned work compete instead of laddering from posture to next action.
  • Evidence and diagnostics are present, but the proof path is not visually distinct from navigation.

Target User Promise

In five seconds, a workspace owner knows whether the workspace needs action, which environment needs attention first, and where the evidence trail lives.

First-Five-Seconds Target

Show a single workspace posture band, one dominant "Review priority environment" action, and a short attention queue with reason and evidence link.

Primary Decision

Which workspace-level item needs operator attention first?

Primary Action

Review priority environment.

Secondary Actions

Open operations, review governance inbox, inspect backup readiness, review audit trail.

Target Information Hierarchy

  1. Workspace context and posture.
  2. One priority decision with reason and impact.
  3. Environment attention list.
  4. Evidence and OperationRun traceability.
  5. Secondary diagnostic summaries.

Main-View Keep / Promote / Simplify

Treatment Elements
Keep Workspace name, environment count, governance/backup/recovery attention, active operations.
Promote Priority environment, reason, impact, evidence link, primary action.
Simplify Equal-weight card grid, repeated navigation links, diagnostic counts without a decision role.

Detail Drawer Treatment

Use a right-side detail drawer for selected environment attention. It should show reason, evidence basis, recent runs, and diagnostics in separate sections.

Advanced/Admin Treatment

Workspace settings, member management, raw health diagnostics, and configuration shortcuts stay behind secondary links or menus.

Hidden/Removed Default Elements

Hide raw operation payloads, provider error IDs, and repeated "open" links from the default view.

Target Layout Direction

Use a wide decision header, left priority queue, right evidence/operations strip, and lower secondary domain summaries. Avoid decorative dashboard charts.

Visual Target Direction

Calm dark command surface with ivory text, warm graphite panels, mint as a narrow action accent, amber for attention, and restrained violet for evidence links.

Status/Trust Model

No green success state unless the underlying state is verified. Separate execution state, governance attention, and backup/recovery posture.

Dangerous Actions

No destructive action should be primary on the workspace home. Downstream backup/restore/provider actions must disclose mutation scope before execution.

Customer-Safe Review Notes

Not customer-facing by default. Any customer-shareable summary must hide diagnostics and raw provider details.

Workspace/Environment Context

Workspace is explicit in the header. Environment-specific items must show the environment name before any action link.

Empty / Loading / Error States

Empty state should say no environments are ready for review and offer one setup action. Loading should preserve the workspace shell. Error state should explain whether workspace context, environment data, or operations data failed.

Accessibility Notes

Priority items need visible labels beyond color. The primary action must be reachable by keyboard before secondary links.

Repo-Truth Classification

Target element Classification Notes
Workspace route and source screenshot repo-verified Spec 323 browser pass reached the route.
Workspace attention cards repo-verified Present in page report as current content class.
Priority environment queue plausible-existing Derived from existing attention concepts, needs runtime data verification.
Evidence strip foundation-only Audit/evidence surfaces exist, but exact workspace aggregate needs later spec.
Final brand tokens spec-only Spec 325 direction, not final brand governance.

Screenshot-Anchored Image Prompt

Start from ui-001-workspace-overview.png. Create a target design direction, not runtime implementation. Preserve the workspace-home purpose. Fix competing next actions by showing workspace posture, one primary priority-environment action, reason/impact, evidence link, and secondary operations/governance/backup summaries. Keep diagnostics secondary. Use calm dark enterprise styling with Tenantial mint as an accent. Avoid generic blue SaaS, fake compliance claims, green success without verification, placeholder nonsense text, decorative charts, and runtime implementation claims.

Implementation Pattern Requirements

  • Use an explicit workspace context header.
  • Keep one dominant next action.
  • Separate governance, operation, and backup/recovery state.
  • Link evidence and OperationRun proof without making diagnostics primary.

Later Implementation Candidate

Workspace and Environment dashboard productization.

Non-Goals For Later Implementation

Do not add new workspace metrics, new persisted posture truth, or a dashboard framework without a separate spec.