TenantAtlas/.specify/templates/tasks-template.md
ahmido a770b32e87 feat: action-surface contract inspect affordance + clickable rows (#100)
Implements Spec 082 updates to the Filament Action Surface Contract:

- New required list/table slot: InspectAffordance (clickable row via recordUrl preferred; also supports View action or primary link column)
- Retrofit view-only tables to remove lone View row action buttons and use clickable rows
- Update validator + guard tests, add golden regression assertions
- Add docs: docs/ui/action-surface-contract.md

Tests (local via Sail):
- vendor/bin/sail artisan test --compact tests/Feature/Guards/ActionSurfaceContractTest.php
- vendor/bin/sail artisan test --compact tests/Feature/Guards/ActionSurfaceValidatorTest.php
- vendor/bin/sail artisan test --compact tests/Feature/Rbac/ActionSurfaceRbacSemanticsTest.php
- vendor/bin/sail artisan test --compact tests/Feature/Filament/EntraGroupSyncRunResourceTest.php

Notes:
- Filament v5 / Livewire v4 compatible.
- No destructive-action behavior changed in this PR.

Co-authored-by: Ahmed Darrazi <ahmeddarrazi@MacBookPro.fritz.box>
Reviewed-on: #100
2026-02-08 20:31:36 +00:00

278 lines
11 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

---
description: "Task list template for feature implementation"
---
# Tasks: [FEATURE NAME]
**Input**: Design documents from `/specs/[###-feature-name]/`
**Prerequisites**: plan.md (required), spec.md (required for user stories), research.md, data-model.md, contracts/
**Tests**: For runtime behavior changes in this repo, tests are REQUIRED (Pest). Only docs-only changes may omit tests.
**Operations**: If this feature introduces long-running/remote/queued/scheduled work, include tasks to create/reuse and update a
canonical `OperationRun`, and ensure “View run” links route to the canonical Monitoring hub.
If security-relevant DB-only actions skip `OperationRun`, include tasks for `AuditLog` entries (before/after + actor + tenant).
Auth handshake exception (OPS-EX-AUTH-001): OIDC/SAML login handshakes may perform synchronous outbound HTTP on `/auth/*` endpoints
without an `OperationRun`.
**RBAC**: If this feature introduces or changes authorization, tasks MUST include:
- explicit Gate/Policy enforcement for all mutation endpoints/actions,
- explicit 404 vs 403 semantics:
- non-member / not entitled to tenant scope → 404 (deny-as-not-found)
- member but missing capability → 403,
- capability registry usage (no raw capability strings; no role-string checks in feature code),
- tenant-safe global search scoping (no hints; inaccessible results treated as 404 semantics),
- destructive-like actions use `->requiresConfirmation()` (authorization still server-side),
- cross-plane deny-as-not-found (404) checks where applicable,
- at least one positive + one negative authorization test.
**Filament UI Action Surfaces**: If this feature adds/modifies any Filament Resource / RelationManager / Page, tasks MUST include:
- filling the specs “UI Action Matrix” for all changed surfaces,
- implementing required action surfaces (header/row/bulk/empty-state CTA for lists; header actions for view; consistent save/cancel on create/edit),
- ensuring every List/Table has a record inspection affordance (prefer `recordUrl()` clickable rows; do not render a lone View row action),
- enforcing the “max 2 visible row actions; everything else in More ActionGroup” rule,
- grouping bulk actions via BulkActionGroup,
- adding confirmations for destructive actions (and typed confirmation where required by scale),
- adding `AuditLog` entries for relevant mutations,
- adding/updated tests that enforce the contract and block merge on violations, OR documenting an explicit exemption with rationale.
**Badges**: If this feature changes status-like badge semantics, tasks MUST use `BadgeCatalog` / `BadgeRenderer` (BADGE-001),
avoid ad-hoc mappings in Filament, and include mapping tests for any new/changed values.
**Organization**: Tasks are grouped by user story to enable independent implementation and testing of each story.
## Format: `[ID] [P?] [Story] Description`
- **[P]**: Can run in parallel (different files, no dependencies)
- **[Story]**: Which user story this task belongs to (e.g., US1, US2, US3)
- Include exact file paths in descriptions
## Path Conventions
- **Single project**: `src/`, `tests/` at repository root
- **Web app**: `backend/src/`, `frontend/src/`
- **Mobile**: `api/src/`, `ios/src/` or `android/src/`
- Paths shown below assume single project - adjust based on plan.md structure
<!--
============================================================================
IMPORTANT: The tasks below are SAMPLE TASKS for illustration purposes only.
The /speckit.tasks command MUST replace these with actual tasks based on:
- User stories from spec.md (with their priorities P1, P2, P3...)
- Feature requirements from plan.md
- Entities from data-model.md
- Endpoints from contracts/
Tasks MUST be organized by user story so each story can be:
- Implemented independently
- Tested independently
- Delivered as an MVP increment
DO NOT keep these sample tasks in the generated tasks.md file.
============================================================================
-->
## Phase 1: Setup (Shared Infrastructure)
**Purpose**: Project initialization and basic structure
- [ ] T001 Create project structure per implementation plan
- [ ] T002 Initialize [language] project with [framework] dependencies
- [ ] T003 [P] Configure linting and formatting tools
---
## Phase 2: Foundational (Blocking Prerequisites)
**Purpose**: Core infrastructure that MUST be complete before ANY user story can be implemented
**⚠️ CRITICAL**: No user story work can begin until this phase is complete
Examples of foundational tasks (adjust based on your project):
- [ ] T004 Setup database schema and migrations framework
- [ ] T005 [P] Implement authentication/authorization framework
- [ ] T006 [P] Setup API routing and middleware structure
- [ ] T007 Create base models/entities that all stories depend on
- [ ] T008 Configure error handling and logging infrastructure
- [ ] T009 Setup environment configuration management
**Checkpoint**: Foundation ready - user story implementation can now begin in parallel
---
## Phase 3: User Story 1 - [Title] (Priority: P1) 🎯 MVP
**Goal**: [Brief description of what this story delivers]
**Independent Test**: [How to verify this story works on its own]
### Tests for User Story 1 (OPTIONAL - only if tests requested) ⚠️
> **NOTE: Write these tests FIRST, ensure they FAIL before implementation**
- [ ] T010 [P] [US1] Contract test for [endpoint] in tests/contract/test_[name].py
- [ ] T011 [P] [US1] Integration test for [user journey] in tests/integration/test_[name].py
### Implementation for User Story 1
- [ ] T012 [P] [US1] Create [Entity1] model in src/models/[entity1].py
- [ ] T013 [P] [US1] Create [Entity2] model in src/models/[entity2].py
- [ ] T014 [US1] Implement [Service] in src/services/[service].py (depends on T012, T013)
- [ ] T015 [US1] Implement [endpoint/feature] in src/[location]/[file].py
- [ ] T016 [US1] Add validation and error handling
- [ ] T017 [US1] Add logging for user story 1 operations
**Checkpoint**: At this point, User Story 1 should be fully functional and testable independently
---
## Phase 4: User Story 2 - [Title] (Priority: P2)
**Goal**: [Brief description of what this story delivers]
**Independent Test**: [How to verify this story works on its own]
### Tests for User Story 2 (OPTIONAL - only if tests requested) ⚠️
- [ ] T018 [P] [US2] Contract test for [endpoint] in tests/contract/test_[name].py
- [ ] T019 [P] [US2] Integration test for [user journey] in tests/integration/test_[name].py
### Implementation for User Story 2
- [ ] T020 [P] [US2] Create [Entity] model in src/models/[entity].py
- [ ] T021 [US2] Implement [Service] in src/services/[service].py
- [ ] T022 [US2] Implement [endpoint/feature] in src/[location]/[file].py
- [ ] T023 [US2] Integrate with User Story 1 components (if needed)
**Checkpoint**: At this point, User Stories 1 AND 2 should both work independently
---
## Phase 5: User Story 3 - [Title] (Priority: P3)
**Goal**: [Brief description of what this story delivers]
**Independent Test**: [How to verify this story works on its own]
### Tests for User Story 3 (OPTIONAL - only if tests requested) ⚠️
- [ ] T024 [P] [US3] Contract test for [endpoint] in tests/contract/test_[name].py
- [ ] T025 [P] [US3] Integration test for [user journey] in tests/integration/test_[name].py
### Implementation for User Story 3
- [ ] T026 [P] [US3] Create [Entity] model in src/models/[entity].py
- [ ] T027 [US3] Implement [Service] in src/services/[service].py
- [ ] T028 [US3] Implement [endpoint/feature] in src/[location]/[file].py
**Checkpoint**: All user stories should now be independently functional
---
[Add more user story phases as needed, following the same pattern]
---
## Phase N: Polish & Cross-Cutting Concerns
**Purpose**: Improvements that affect multiple user stories
- [ ] TXXX [P] Documentation updates in docs/
- [ ] TXXX Code cleanup and refactoring
- [ ] TXXX Performance optimization across all stories
- [ ] TXXX [P] Additional unit tests (if requested) in tests/unit/
- [ ] TXXX Security hardening
- [ ] TXXX Run quickstart.md validation
---
## Dependencies & Execution Order
### Phase Dependencies
- **Setup (Phase 1)**: No dependencies - can start immediately
- **Foundational (Phase 2)**: Depends on Setup completion - BLOCKS all user stories
- **User Stories (Phase 3+)**: All depend on Foundational phase completion
- User stories can then proceed in parallel (if staffed)
- Or sequentially in priority order (P1 → P2 → P3)
- **Polish (Final Phase)**: Depends on all desired user stories being complete
### User Story Dependencies
- **User Story 1 (P1)**: Can start after Foundational (Phase 2) - No dependencies on other stories
- **User Story 2 (P2)**: Can start after Foundational (Phase 2) - May integrate with US1 but should be independently testable
- **User Story 3 (P3)**: Can start after Foundational (Phase 2) - May integrate with US1/US2 but should be independently testable
### Within Each User Story
- Tests (if included) MUST be written and FAIL before implementation
- Models before services
- Services before endpoints
- Core implementation before integration
- Story complete before moving to next priority
### Parallel Opportunities
- All Setup tasks marked [P] can run in parallel
- All Foundational tasks marked [P] can run in parallel (within Phase 2)
- Once Foundational phase completes, all user stories can start in parallel (if team capacity allows)
- All tests for a user story marked [P] can run in parallel
- Models within a story marked [P] can run in parallel
- Different user stories can be worked on in parallel by different team members
---
## Parallel Example: User Story 1
```bash
# Launch all tests for User Story 1 together (if tests requested):
Task: "Contract test for [endpoint] in tests/contract/test_[name].py"
Task: "Integration test for [user journey] in tests/integration/test_[name].py"
# Launch all models for User Story 1 together:
Task: "Create [Entity1] model in src/models/[entity1].py"
Task: "Create [Entity2] model in src/models/[entity2].py"
```
---
## Implementation Strategy
### MVP First (User Story 1 Only)
1. Complete Phase 1: Setup
2. Complete Phase 2: Foundational (CRITICAL - blocks all stories)
3. Complete Phase 3: User Story 1
4. **STOP and VALIDATE**: Test User Story 1 independently
5. Deploy/demo if ready
### Incremental Delivery
1. Complete Setup + Foundational → Foundation ready
2. Add User Story 1 → Test independently → Deploy/Demo (MVP!)
3. Add User Story 2 → Test independently → Deploy/Demo
4. Add User Story 3 → Test independently → Deploy/Demo
5. Each story adds value without breaking previous stories
### Parallel Team Strategy
With multiple developers:
1. Team completes Setup + Foundational together
2. Once Foundational is done:
- Developer A: User Story 1
- Developer B: User Story 2
- Developer C: User Story 3
3. Stories complete and integrate independently
---
## Notes
- [P] tasks = different files, no dependencies
- [Story] label maps task to specific user story for traceability
- Each user story should be independently completable and testable
- Verify tests fail before implementing
- Commit after each task or logical group
- Stop at any checkpoint to validate story independently
- Avoid: vague tasks, same file conflicts, cross-story dependencies that break independence