## Summary - finalize the restore create wizard productization across safety, validation, preview, and confirmation steps - refine the restore presenter output and Blade component rendering for clearer proof, scope, resolver, and execution-readiness states - add and update feature and browser coverage plus Spec 333 artifacts and screenshots ## Testing - Not run as part of this commit/PR task Co-authored-by: Ahmed Darrazi <ahmed.darrazi@live.de> Reviewed-on: #403
2.1 KiB
2.1 KiB
Specification Quality Checklist: Spec 333 - Restore Create UX Final Productization
Purpose: Validate specification completeness and quality before implementation planning and execution.
Created: 2026-05-26
Feature: specs/333-restore-create-ux-final-productization/spec.md
Content Quality
- No application implementation is included in the preparation artifacts.
- Focused on operator value, safety, proof visibility, and product workflow needs.
- All mandatory repository sections are completed.
- The spec preserves TenantPilot/TenantAtlas terminology and route/context language.
Requirement Completeness
- No
[NEEDS CLARIFICATION]markers remain. - Requirements are testable and unambiguous.
- Success criteria are measurable.
- Acceptance scenarios are defined for each primary user story.
- Edge cases are identified.
- Scope is clearly bounded to Restore Create UX productization.
- Dependencies and assumptions are identified.
Constitution / Guardrail Alignment
- Spec Candidate Check is filled and passes SPEC-GATE-001.
- UI Surface Impact and UI/Productization Coverage are filled for the changed wizard surface.
- Proportionality review explicitly rejects new architecture, persisted truth, enum/status families, and backend rewrites.
- RBAC, workspace/environment isolation, proof semantics, OperationRun UX impact, and provider-boundary impact are addressed.
- Test governance and validation lanes are explicit.
Feature Readiness
spec.md,plan.md,tasks.md, andrestore-create-state-contract.mdexist.- Tasks are ordered, small, verifiable, and implementation-ready.
- Required screenshot artifacts path is present.
- Close alternatives and follow-up specs are kept out of scope.
Notes
- Preparation analysis should re-check that no task requires a backend rewrite, new presenter, migration, package, or new Product Process Flow architecture.
- Implementation must update spec/plan before runtime work if repo truth differs from skip behavior, item-level selection, proof-link availability, or group picker context assumptions.