## Summary - retrofit the tenant detail recent-operations and verification surfaces to keep one clear primary inspect path per state - keep onboarding workflow actions on the wizard step while moving previous-run and advanced monitoring links into diagnostics-only technical details - add focused spec 172 design artifacts, feature coverage, and a dedicated browser smoke test for the deferred operator surface retrofit ## Testing - `vendor/bin/sail artisan test --compact tests/Browser/Spec172DeferredOperatorSurfacesSmokeTest.php tests/Browser/OnboardingDraftRefreshTest.php tests/Browser/OnboardingDraftVerificationResumeTest.php` ## Notes - base branch: `dev` - branch head: `172-deferred-operator-surfaces-retrofit` - browser smoke pack passed locally after the final changes Co-authored-by: Ahmed Darrazi <ahmed.darrazi@live.de> Reviewed-on: #203
36 lines
1.5 KiB
Markdown
36 lines
1.5 KiB
Markdown
# Specification Quality Checklist: Deferred Operator Surfaces Retrofit
|
|
|
|
**Purpose**: Validate specification completeness and quality before proceeding to planning
|
|
**Created**: 2026-03-30
|
|
**Feature**: [spec.md](../spec.md)
|
|
|
|
## Content Quality
|
|
|
|
- [x] No implementation details (languages, frameworks, APIs)
|
|
- [x] Focused on user value and business needs
|
|
- [x] Written for non-technical stakeholders
|
|
- [x] All mandatory sections completed
|
|
|
|
## Requirement Completeness
|
|
|
|
- [x] No [NEEDS CLARIFICATION] markers remain
|
|
- [x] Requirements are testable and unambiguous
|
|
- [x] Success criteria are measurable
|
|
- [x] Success criteria are technology-agnostic (no implementation details)
|
|
- [x] All acceptance scenarios are defined
|
|
- [x] Edge cases are identified
|
|
- [x] Scope is clearly bounded
|
|
- [x] Dependencies and assumptions identified
|
|
|
|
## Feature Readiness
|
|
|
|
- [x] All functional requirements have clear acceptance criteria
|
|
- [x] User scenarios cover primary flows
|
|
- [x] Feature meets measurable outcomes defined in Success Criteria
|
|
- [x] No implementation details leak into specification
|
|
|
|
## Notes
|
|
|
|
- Validation pass 1: complete
|
|
- This spec intentionally targets only deferred non-table surfaces that already expose operation affordances; unrelated deferred pages remain explicit non-goals unless a later spec enrolls them.
|
|
- Validation pass 2: aligned route and surface naming with the current implementation. The tenant detail view and onboarding verification surfaces are in scope; the table-based tenant dashboard operations widget remains out of scope for this deferred-surface retrofit. |