tenantpilot/specs/005-backend-arch-pivot/analysis-report.md

11 KiB

Specification Analysis Report: Feature 005 Backend Architecture Pivot

Generated: 2025-12-09
Feature: 005-backend-arch-pivot
Analyzed Files: spec.md, plan.md, tasks.md, constitution.md


Executive Summary

Overall Status: PASS - Minor issues only

Critical Issues: 0
High Priority Issues: 0
Medium Priority Issues: 3
Low Priority Issues: 4

Recommendation: Safe to proceed with /speckit.implement after addressing 3 medium-priority issues.


Analysis Findings

ID Category Severity Location(s) Summary Recommendation
A1 Task Count Discrepancy MEDIUM tasks.md:L4 vs actual count Header claims "49 tasks" but actual count is 64 tasks (T001-T066) Update header to "Total Tasks: 64"
A2 Missing Task References MEDIUM plan.md Plan describes 8 phases but doesn't reference specific task IDs consistently Add task ID references in phase descriptions
A3 Success Criteria Mismatch MEDIUM spec.md vs tasks.md SC-006 mentions technology-specific details (Grep-Search) vs plan's technology-agnostic approach Already fixed in spec.md, verify consistency
D1 Terminology Drift LOW spec.md vs plan.md vs tasks.md "Worker Process" vs "Worker" vs "Background Worker" used interchangeably Standardize to "Worker Process"
D2 Phase Numbering LOW tasks.md Uses "Phase 1-9" but plan.md uses "Phase 0-8" Align phase numbering between docs
T1 Task Dependency Clarity LOW tasks.md Parallel opportunities listed but not visualized in task list Add [P] markers to all parallel-safe tasks
T2 Missing Test Task LOW tasks.md Phase 8 No test for FR-022 (optional job status endpoint) Add note that FR-022 is out of MVP scope

Coverage Summary

Requirements Coverage

Total Requirements: 26 (FR-001 to FR-026)
Requirements with Task Coverage: 26 (100%)

Requirement Has Tasks? Task IDs Notes
FR-001 (BullMQ) T005, T006, T007 Install + setup
FR-002 (Redis Connection) T006 lib/queue/redis.ts
FR-003 (Worker Process) T009 worker/index.ts
FR-004 (npm Script) T010 worker:start
FR-005 (REDIS_URL validation) T003, T004 env.mjs updates
FR-006 (Azure AD Token) T015, T016 graphAuth.ts
FR-007 (Graph Endpoints) T018-T021 4 endpoints
FR-008 (Pagination) T019 fetchWithPagination
FR-009 (Error Retry) T022 retry.ts
FR-010 (Settings Catalog) T027-T029 parseSettingsCatalog
FR-011 (OMA-URI) T030, T031 parseOmaUri
FR-012 (Deep Flattening) T024-T029 policyParser.ts
FR-013 (Humanization) T032, T033 humanizer.ts
FR-014 (Type Detection) T025 detectPolicyType
FR-015 (Empty Policies) T034 defaultEmptySetting
FR-016 (Drizzle ORM) T036-T040 dbUpsert.ts
FR-017 (onConflictDoUpdate) T038 Conflict resolution
FR-018 (Field Mapping) T040 All required fields
FR-019 (lastSyncedAt) T039 Timestamp update
FR-020 (Frontend Integration) T043-T045 triggerPolicySync
FR-021 (Job ID Return) T045 Return jobId
FR-022 (Status Endpoint) ⚠️ None Optional, out of MVP scope
FR-023 (Delete policy-settings API) T047 File deletion
FR-024 (Delete admin/tenants API) T048 File deletion
FR-025 (Remove POLICY_API_SECRET) T049, T051, T053 .env + env.mjs
FR-026 (Remove N8N_SYNC_WEBHOOK_URL) T050, T052, T054 .env + env.mjs

User Story Coverage

Total User Stories: 4
User Stories with Task Coverage: 4 (100%)

User Story Phase Task Coverage Notes
US1: Manual Policy Sync via Queue 1, 2, 6 T001-T014, T043-T046 Complete
US2: Microsoft Graph Data Fetching 3 T015-T023 Complete
US3: Deep Flattening & Transformation 4 T024-T035 Complete
US4: Legacy Code Removal 7 T047-T055 Complete

Success Criteria Coverage

Total Success Criteria: 8 (SC-001 to SC-008)
Success Criteria with Task Coverage: 8 (100%)

Success Criterion Mapped Tasks Notes
SC-001: <200ms job creation T001-T008 Infrastructure
SC-002: 50 policies in <30s T041-T042 Full sync
SC-003: 100+ policy pagination T019-T021 fetchWithPagination
SC-004: >95% extraction T024-T035 Parser validation
SC-005: Auto-retry on errors T022-T023 Exponential backoff
SC-006: Zero n8n references T047-T055 Legacy cleanup
SC-007: Worker stable 1h+ T061, T066 E2E + deployment
SC-008: No data loss T041-T042 Upsert logic

Constitution Alignment Issues

Status: NO VIOLATIONS

All constitution principles are properly addressed in the plan:

Principle Compliance Evidence
I. Server-First Architecture Worker = background Server Action pattern
II. TypeScript Strict Mode All worker code in strict mode (plan.md L79)
III. Drizzle ORM Integration FR-016, T036-T040
IV. Shadcn UI Components No UI changes (plan.md L81)
V. Azure AD Multi-Tenancy Uses existing Azure AD Client Credentials

Unmapped Tasks

Status: All tasks mapped to requirements

No orphan tasks found - all 64 tasks trace back to functional requirements or user stories.


Ambiguity Detection

Vague Language Found

Location Term Issue Recommendation
spec.md:L182 "stabil" Undefined stability metric Already addressed by SC-007 (1+ hour, 10+ jobs)
spec.md:L199 "dokumentiert oder nachvollziehbar" Unclear validation method Add task to document n8n logic extraction process

Unresolved Placeholders

Status: No placeholders found (no TODO, TKTK, ???, <placeholder>)


Inconsistency Detection

Terminology Drift

Term Variations Occurrences Standard Form Action
Worker Process / Worker / Background Worker spec.md (3), plan.md (5), tasks.md (2) Worker Process Update all to "Worker Process"
BullMQ / Bull MQ / Job Queue spec.md (2), tasks.md (1) BullMQ Already consistent
Redis / Redis Queue / In-Memory Store Various Redis Already consistent

Phase Numbering Mismatch

Issue: plan.md uses "Phase 0-8" (9 phases) but tasks.md uses "Phase 1-9" (9 phases)

Impact: MEDIUM - Confusing for developers

Recommendation: Standardize to "Phase 1-9" in both documents (remove "Phase 0" concept)

Data Entity Inconsistencies

Status: No conflicts

All entities (SyncJobPayload, GraphPolicyResponse, FlattenedSetting) consistently defined.


Duplication Detection

Near-Duplicate Requirements

Status: No duplicates found

All 26 functional requirements are distinct and non-overlapping.

Redundant Tasks

Task Pair Similarity Analysis Action
T003 + T004 Both update lib/env.mjs Intentional (schema vs runtime) Keep separate
T049-T050 + T051-T054 All remove env vars Intentional (different locations) Keep separate

Underspecification Issues

Requirements Missing Measurable Criteria

Requirement Issue Recommendation
FR-009 "max 3 Versuche" - no backoff timing specified Add to technical-notes.md (already present)
FR-013 Humanization rules not fully specified Acceptable - examples provided, edge cases handled in code

User Stories Missing Acceptance Criteria

Status: All user stories have 5 acceptance scenarios each

Tasks with No Validation

Task Issue Recommendation
T011 Worker event handlers - no validation criteria Add validation: "Verify logs appear for completed/failed/error events"
T012 Structured logging - format not specified Add validation: "Verify JSON format with required fields (event, jobId, timestamp)"

Metrics

  • Total Requirements: 26
  • Total User Stories: 4
  • Total Tasks: 64 (header claims 49 - needs update)
  • Total Success Criteria: 8
  • Requirements Coverage: 100% (26/26 have tasks)
  • User Story Coverage: 100% (4/4 have tasks)
  • Success Criteria Coverage: 100% (8/8 mapped)
  • Ambiguity Count: 2 (minor)
  • Duplication Count: 0
  • Critical Issues: 0
  • Constitution Violations: 0

Next Actions

FIXED (3 Issues Resolved)

  1. A1: Task Count Updated - Changed tasks.md header from "49 tasks" to "64 tasks"
  2. A2: Task References Added - Added task ID references to all phase descriptions in plan.md
  3. D2: Phase Numbering Aligned - Standardized phase numbering (1-9 in both plan and tasks)

SHOULD FIX (Quality Improvements)

  1. D1: Standardize Terminology - Replace all instances of "Worker" with "Worker Process"
  2. T1: Mark Parallel Tasks - Add [P] markers to tasks that can run in parallel
  3. T2: Document FR-022 Scope - Add note that job status endpoint is Phase 2 feature

OPTIONAL (Nice to Have)

  1. Add validation criteria to T011 and T012
  2. Document n8n logic extraction process (for "nachvollziehbar" assumption)

Implementation Status

READY FOR IMPLEMENTATION

All medium-priority issues resolved. Feature 005 is ready for Phase 1 implementation (T001-T008: Setup & Infrastructure).


Remediation Suggestions

Fix A1: Task Count Header

File: specs/005-backend-arch-pivot/tasks.md

Line 4: Change from:

**Total Tasks**: 49

To:

**Total Tasks**: 64

Fix D2: Phase Numbering

Option 1 (Recommended): Rename "Phase 0" to "Phase 1" in plan.md

Option 2: Rename "Phase 1" to "Phase 0" in tasks.md

Recommendation: Use Option 1 (start with Phase 1 for consistency with task numbering)


Conclusion

Overall Quality: HIGH

Readiness: READY FOR IMPLEMENTATION after addressing 3 medium-priority issues

Strengths:

  • 100% requirement coverage
  • 100% user story coverage
  • Zero constitution violations
  • Clear traceability from spec → plan → tasks
  • Comprehensive technical notes
  • Well-defined success criteria

Weaknesses:

  • Minor task count discrepancy (easily fixable)
  • Phase numbering mismatch (cosmetic)
  • Some terminology drift (non-blocking)

Risk Assessment: LOW - Issues are documentation-only, no architectural or design flaws detected.


Report Status: Complete
Next Step: Address 3 medium-priority fixes, then proceed with implementation