Summary: Upgrade Filament to v5 (Livewire v4), replace Filament v4-only plugins, add first-party JSON renderer, and harden Monitoring/Ops UX guardrails. What I changed: Composer: upgraded filament/filament → v5, removed pepperfm/filament-json and lara-zeus/torch-filament, added torchlight/engine. Views: replaced JSON viewer with json-viewer.blade.php and updated snapshot display. Tests: added DB-only + tenant-isolation guard tests under Monitoring and OpsUx, plus Filament smoke tests. Specs: added/updated specs/057-filament-v5-upgrade/* (spec, tasks, plan, quickstart, research). Formatting: ran Pint; ran full test suite (641 passed, 5 skipped). Validation: Ran ./vendor/bin/sail artisan test (full suite) — all tests passed. Ran ./vendor/bin/sail pint --dirty — formatting applied. Ran npm run build locally (Vite) — assets generated. Notes / Rollback: Rollback: revert composer.json/composer.lock and build assets; documented in quickstart.md. One pending app migration was noted during validation; ensure migrations are applied in staging before deploy. Reviewers: @frontend, @backend (adjust as needed) Spec links: spec.md tasks.md quickstart.md Co-authored-by: Ahmed Darrazi <ahmeddarrazi@adsmac.local> Reviewed-on: #66
1.3 KiB
1.3 KiB
Specification Quality Checklist: Admin UI Stack Upgrade (Panel + Suite)
Purpose: Validate specification completeness and quality before proceeding to planning Created: 2026-01-20 Feature: specs/057-filament-v5-upgrade/spec.md
Content Quality
- No implementation details (languages, frameworks, APIs)
- Focused on user value and business needs
- Written for non-technical stakeholders
- All mandatory sections completed
Requirement Completeness
- No [NEEDS CLARIFICATION] markers remain
- Requirements are testable and unambiguous
- Success criteria are measurable
- Success criteria are technology-agnostic (no implementation details)
- All acceptance scenarios are defined
- Edge cases are identified
- Scope is clearly bounded
- Dependencies and assumptions identified
Feature Readiness
- All functional requirements have clear acceptance criteria
- User scenarios cover primary flows
- Feature meets measurable outcomes defined in Success Criteria
- No implementation details leak into specification
Notes
- This is a technical upgrade, but the spec intentionally describes outcomes and guardrails rather than implementation steps.
- Proceed to planning: identify concrete packages, versions, and migration steps in plan/tasks.