TenantAtlas/specs/115-baseline-operability-alerts/checklists/requirements.md
ahmido fdfb781144 feat(115): baseline operability + alerts (#140)
Implements Spec 115 (Baseline Operability & Alert Integration).

Key changes
- Baseline compare: safe auto-close of stale baseline findings (gated on successful/complete compares)
- Baseline alerts: `baseline_high_drift` + `baseline_compare_failed` with dedupe/cooldown semantics
- Workspace settings: baseline severity mapping + minimum severity threshold + auto-close toggle
- Baseline Compare UX: shared stats layer + landing/widget consistency

Notes
- Livewire v4 / Filament v5 compatible.
- Destructive-like actions require confirmation (no new destructive actions added here).

Tests
- `vendor/bin/sail artisan test --compact tests/Feature/Baselines/ tests/Feature/Alerts/`

Co-authored-by: Ahmed Darrazi <ahmed.darrazi@live.de>
Reviewed-on: #140
2026-03-01 02:26:47 +00:00

35 lines
1.4 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Specification Quality Checklist: Baseline Operability & Alert Integration
**Purpose**: Validate specification completeness and quality before proceeding to planning
**Created**: 2026-02-28
**Feature**: [specs/115-baseline-operability-alerts/spec.md](../spec.md)
## Content Quality
- [x] No implementation details (languages, frameworks, APIs)
- [x] Focused on user value and business needs
- [x] Written for non-technical stakeholders
- [x] All mandatory sections completed
## Requirement Completeness
- [x] No [NEEDS CLARIFICATION] markers remain
- [x] Requirements are testable and unambiguous
- [x] Success criteria are measurable
- [x] Success criteria are technology-agnostic (no implementation details)
- [x] All acceptance scenarios are defined
- [x] Edge cases are identified
- [x] Scope is clearly bounded
- [x] Dependencies and assumptions identified
## Feature Readiness
- [x] All functional requirements have clear acceptance criteria
- [x] User scenarios cover primary flows
- [x] Feature meets measurable outcomes defined in Success Criteria
- [x] No implementation details leak into specification
## Notes
- Validation complete.
- The spec intentionally references internal platform concepts (capability registry, operation runs, admin UI action surfaces) because they are required by the repositorys constitution; it does not prescribe languages, external APIs, or framework implementation steps.